Trophy Wood District Project

This project includes:

Trophy Wood District is a 12 plus acre suburban destination that will feature distinctive shopping/dining, overnight accommodations, a Town Hall/Police facility, and public amenities. The district is currently home to:

  • Baylor Medical Center
  • Breadwinner’s/Quarter Bar
  • Four exquisite hotels
  • Professional office
HGSuply

Other Resources:

HGSuplyLogo
Breadwinners logo

About HG Supply Company

Four regular guys wanted a spot to gather, tell big stories, enjoy a good drink and celebrate their victories. They wanted to create a place that served natural, wholesome foods defined not by trends or by labels, but by the truth. 

It’s about giving the world the ability to eat how and what they want. It’s about honest ingredients prepared with intent. It’s about prices that everyone can afford and portions that make sense. It’s about indulging because we deserve it. Simple, clean food, classic drinks, and humble hospitality. It should be that simple.

About Bread Winners Cafe

Bread Winners is the perfect combination of upscale dining and casual, friendly atmosphere. Offering breakfast, lunch, dinner, and their famous weekend brunch. Walk into any of the 4 locations and you are greeted with a tempting array of fresh baked bread, pastries, and desserts. 

The staff always provides prompt, friendly service and expertly prepared continental cuisine. Remember Bread Winners for all your catering and holiday baking needs.

Project Updates

The Town staff intends to provide updates on the happenings as much as it is available. Please remember that the information provided is what is available to staff via their team and other third parties and it is subject to change. Staff will strive to keep Trophy Club looking and functioning at its best while keeping its residents informed to the best of their abilities.

January 28, 2019 - 8:00 AM

PD-25- HGSupply, has requested gas service to be able to start the furnaces and test the fire sprinkler system without weather-related damage possibly having an effect.

January 18, 2019 - 2:30 PM

HGsupply, continues internal work prepping the kitchen area, and outside of the building with wall finishes.

January 14, 2019 - 2:20 PM

HGSuply, received approval from TxDOT to make the tie into the storm sewer at SH114.

January 07, 2019 - 8:00 AM

The project continues to progress with minor delays.

October 8, 2018 - 8 a.m.

The project continues to work inside and go vertical with structures. The adjacent parking lot to Hg Supply nears completion. The paving will require an additional core sample, lights have been installed, striping and signage will have the project completed soon.

September 11, 2018 - 7 p.m.

Progress continues with the exterior masonry, weather cooperating, while interior walls, electrical rough-in, plumbing top out, mechanical rough, and fire sprinkler rough go continuously due to building dry-in. The civil engineer is currently working with TxDOT to complete the storm drain tie-in on Trophy Wood Drive.

August 17, 2018 - 4 p.m.

Rain events during the weekend and week slowed construction. Masons were on site to continue work on building exterior. Temporary parking lot adjacent to Restaurant venue project is set to commence on Monday, August 20, 2018.

August 14, 2018 - 8 a.m.

The steel erection continues along with exterior preparation for masonry finish. Town staff along with TNP representatives held the pre-construction meeting for the temporary parking lot adjacent to HG Supply, the estimated start date is August 20, 2018 with completion anticipated around October 15, 2018.

August 3, 2018- 2:45 p.m.

Steel construction continues to go vertical this week while the wood frame structure is slowly becoming dryed-in.

July 30, 2018 - 7:15 a.m.

Staff met with the contractor on Friday, July 27, 2018 to confirm placement of RTUs. The screening device replacement for the construction fence is ongoing and is scheduled for completion next week. The construction trailer was relocated to its approved location.

July 6, 2018 - 8:30 a.m.

HG Supply, PD-25, is currently in the framing stage and has been given approval for the structural steel compliance by CMJ, the 3rd party inspection firm of record for the project.

June 29, 2018 - 1:30 p.m.

The storm last week was a setback causing new framing to become dislodged from its place. After resetting, new walls are now being constructed and the site continues to take shape. Progress is being made in regards to the parking lot adjacent to the site as well.

June 22, 2018 6:30 p.m.

PD-25, HG Supply continues to go vertical with construction. Walls had to be re-set on Thursday, June 21, 2018, due to storm damage and high winds from Wednesday's event.

June 15, 2018 - 3:30 p.m.

PD 25 going vertical with structural steel and will be making final fire lane pour (250 cubic yards) on Saturday, June 16, 2018, in the morning.

June 11, 2018 - 8 a.m.

Updates coming soon